Carlisle Street, Sheffield · Industrial
Asbestos removal scaffolding on Carlisle Street, Sheffield
- Scaffold Design
Scaffold Design
Pavement gantry and pedestrian lift designs that keep footpaths and roads open beneath the scaffold.

Our pavement gantry designs keep footpaths and roads open beneath a scaffold. On town centre and street front sites, the scaffold often has to stand over the pavement, and the public still needs a safe way past.
A pedestrian lift raises the first lift of the scaffold so people can walk underneath. A gantry goes further, with a deck over the pavement or road that can carry materials, storage or site cabins. Both use beams to carry the scaffold above over the public space, so the beams, the standards, the bracing and the protection overhead all need designing.

We design the clear headroom and width the footpath needs, the protection above it, such as fans, brick guards and a boarded deck, and the scaffold the gantry carries. On Carlisle Street in Sheffield, the scaffold has a pedestrian lift so the pavement stayed open throughout the works.
You receive clear drawings and calculations your scaffolders can build from, your temporary works coordinator can review, and that support any licence the local authority asks for. See our bespoke scaffold design service for other scaffolds.
Our process
Tell us about the building, the pavement or road, and what needs to pass underneath.
We confirm scope, price and delivery date.
We design the gantry or pedestrian lift and the scaffold above it, around the street and the public. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
You receive drawings and calculations ready for your scaffolders, your temporary works coordinator and any licence applications.
What we need from you
Send what you have. If anything's missing, we'll ask.
FAQs
A pedestrian lift raises the first lift of the scaffold so people can walk underneath it. A gantry goes further, with a deck over the pavement or road that can be used to store materials or carry site cabins.
A gantry carries the scaffold above, plus any storage or cabins on its deck, over a public space, using beams and fewer standards than a normal scaffold. The beams, standards, bracing and protection all need designing so the public underneath stays safe.
Yes. On Carlisle Street in Sheffield, the external scaffold has a pedestrian lift, keeping the pavement open underneath while the works went on above.
Scaffold Design
Design of temporary roofs and the scaffolds that carry them, for re roofing, roof repairs and damaged buildings.
Design of scaffold loading bays, including free standing loading bays, for materials such as pallets, tiles, solar panels and plant.
Design of external and internal scaffolds for asbestos removal, including shrink wrapped and sheeted enclosures and access to controlled zones.
Design of scaffold edge protection for roofs, slab edges and other open edges, including free standing edge protection held down with kentledge.
Design of cantilevered scaffolds and scaffold bridges, using beams to span or reach over obstructions where standards can't go down to the ground.
Design of scaffold stair towers and temporary staircases for site access, including towers tied to a building and free standing towers.
Design of scaffolds with sheeting, netting, shrink wrap or full encapsulation, for weather protection, dust control and containment.