Our hoist and MCWP design service covers the temporary works needed to put a construction hoist or mast climbing work platform (MCWP) up safely. Hoists and MCWPs carry heavy loads, and those loads go into their bases, their mast ties and anything they’re landed against.
We design the bases and foundations, the mast ties into the building or structure, and the landings and access platforms where the machine meets a scaffold. Where a scaffold or the building has to carry hoist or MCWP loads, we check it can. Our team has worked in the scaffolding industry since 2012, so we design the hoist and the scaffold around it as one job.
You receive calculations and clear drawings that your site team and hoist supplier can work from, and your temporary works coordinator can review and approve.
We design hoist and MCWP temporary works for sites across the UK and Ireland from our headquarters in Sheffield and our office in Cockermouth. See our temporary works services for other designed solutions.
Our process
Share the hoist or MCWP details, the building drawings and where the machine will go.
We confirm scope, price and delivery date.
We work out the base, tie and landing loads, then design the bases, ties and any scaffold interfaces. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
You receive drawings and calculations ready for your temporary works coordinator, hoist supplier and site team.
What we need from you
Send what you have. If anything's missing, we'll ask.
FAQs
A mast climbing work platform (MCWP) is a powered platform that climbs up one or two masts tied to the building, giving workers and materials a working platform that can be raised and lowered along the face of the building.
Hoists and MCWPs put large loads into their bases and ties, and into any scaffold used for landings. A design makes sure the ground or slab, the ties and the building or scaffold they're tied to can carry those loads safely, and gives your temporary works coordinator calculations to check.
Yes. Our team has worked in the scaffolding industry since 2012, so we can design the hoist or MCWP interface and the scaffold landings together, rather than treating them as separate jobs.
Yes. We use the supplier's loading data and work around their requirements for bases, ties and landings. We can deal with the supplier directly, or work from the information you send us.
Temporary Works
Designs and calculations for crane mats and outrigger pads, matched to the crane, the lift and the ground conditions.
Design of raking shores to support walls during demolition, alteration or repair, with calculations and site ready drawings.
Design of flying shores between parallel walls, for example after a mid terrace building is demolished.
Temporary support for retained facades during demolition and redevelopment, designed around the facade, the site and the programme.
Design of timber shoring, needling, propping and support structures, with calculations and clear details.
Design of formwork for concrete walls, columns, slabs and bases, with calculations and drawings your site team can build from.
Design of temporary demountable structures for events, including stages and roofs, grandstands and seating, towers and platforms, and banner frames, entrance features and walkways.
Send us your drawings and details. We reply to every enquiry within 24 hours.