Crane Mats
Designs and calculations for crane mats and outrigger pads, matched to the crane, the lift and the ground conditions.
Temporary Works
Facade retention designs that keep a retained front safe and stable while the building behind it is rebuilt.

Our facade retention design service helps contractors and developers keep a building’s facade safe while everything behind it changes. When a front elevation is kept for heritage or planning reasons, it needs temporary support from the moment the building behind is demolished until the new structure can hold it permanently.
We design retention schemes around the facade, the site and the programme. That means looking at the facade’s construction and condition, wind loads, the space available on the street and inside the site, ground conditions and anything below ground, and the sequence for putting the support in and taking it out again.
Retention schemes often sit alongside access scaffolding, and because we design scaffolds as well as temporary works, we can design the two to work together. We’ll also look for ways to keep the scheme economical without compromising safety.
You receive calculations, drawings and a staged sequence ready for your temporary works coordinator to review and approve.
We design facade retention schemes for sites across the UK and Ireland from our headquarters in Sheffield and our office in Cockermouth.
Our process
Share drawings and photos of the facade, the site and the planned demolition and rebuild.
We confirm scope, price and delivery date.
We assess the facade, wind and other loads, and the site constraints, then design the retention scheme. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
You receive calculations, drawings and a sequence ready for your temporary works coordinator.
What we need from you
Send what you have. If anything's missing, we'll ask.
FAQs
Facade retention is the temporary support of a building's front wall, usually one with heritage or planning value, while the building behind it is demolished and rebuilt. The temporary structure keeps the facade stable until the new building can support it permanently.
Schemes can be built inside or outside the facade, using scaffold tube and fittings, proprietary systems or structural steel, depending on the site.
Yes. Retention schemes are often combined with access scaffolding, and because we design both, we can make sure they work together.
As early as possible. The retention scheme affects the demolition sequence, the space needed on the street and the programme, so it's best designed alongside the rest of the project.
Temporary Works
Designs and calculations for crane mats and outrigger pads, matched to the crane, the lift and the ground conditions.
Design of raking shores to support walls during demolition, alteration or repair, with calculations and site ready drawings.
Design of flying shores between parallel walls, for example after a mid terrace building is demolished.
Design of timber shoring, needling, propping and support structures, with calculations and clear details.
Design of formwork for concrete walls, columns, slabs and bases, with calculations and drawings your site team can build from.
Design of bases, ties, landings and scaffold interfaces for construction hoists and mast climbing work platforms (MCWPs).
Design of temporary demountable structures for events, including stages and roofs, grandstands and seating, towers and platforms, and banner frames, entrance features and walkways.
Send us your drawings and details. We reply to every enquiry within 24 hours.