Scaffold Design
Third Party Design Checks
Independent checks and calculations that confirm a design is accurate, compliant and safe to build.

Overview
Our third party design check service gives scaffolding contractors, main contractors and temporary works coordinators an independent view of a design before it’s built. An independent check confirms that the design is accurate, compliant and safe, and that it does what the site needs.
We review the design drawings and calculations against the brief, the loads and the relevant standards. Where needed, we carry out our own check calculations rather than simply reading through someone else’s. If something isn’t right, we explain what and why in plain terms, so the designer can update it without a long back and forth.
Checking is also a good way to get value from a design. As well as confirming it’s safe, we’ll point out where a design looks more conservative than it needs to be, which can save material and time on site.
Each check comes with its own design check report, issued alongside our check calculations, for your temporary works records.
We check designs for projects across the UK and Ireland from our headquarters in Sheffield and our office in Cockermouth. If you need a new design rather than a check, see our scaffold design services.
Our process
How it works
Step 1: Send the design
Share the drawings, calculations and any design brief.
Step 2: Quote within 24 hours
We confirm the check required, the price and the expected date.
Step 3: Independent check
We review the design and carry out check calculations. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
Step 4: Check report
You receive our design check report, with our check calculations alongside it, setting out our findings and confirming when the design is acceptable.
What we need from you
Information to send for a quote
Send what you have. If anything's missing, we'll ask.
- The design drawings and calculations to be checked
- The design brief, including loads and site constraints
- The check category required, if known
- Site address and programme dates
FAQs
Frequently asked questions
Why does a design need an independent check?
An independent check gives confidence that a design is correct before it's built. BS 5975 sets out design check categories, and the level of independence needed depends on how complex and high risk the temporary works are. Your temporary works coordinator will usually decide which category applies.
Which check categories do you carry out?
We carry out design checks up to and including Category 2 under BS 5975. Your temporary works coordinator will usually say which category is needed. If you're not sure, send us the details and we'll advise.
Can you check designs that aren't scaffolding?
Our checking service is mainly for scaffold and temporary works designs. If you have another type of design to check, get in touch and we'll tell you if we can help.
What if the check finds a problem?
We set out each issue clearly, explain why it matters and, where helpful, suggest how it can be resolved so the designer can update the design quickly.
Scaffold Design
Other scaffold design services
Bespoke Scaffold Design
Bespoke scaffold designs with drawings and calculations, for access scaffolds, loading bays, temporary roofs, cantilevers, bridges and more.
Scaffolding Calculations
Scaffolding calculations for ties, loads, bases, beams, wind and more, on their own or to support a scaffold design.
As Built Designs
Designs for scaffolds that have already been erected or altered on site, with drawings and calculations of what's there.
3D Scaffold Modelling
3D models of scaffold designs, so contractors, clients and site teams can see how the scaffold fits the building and the site.
Designer's Risk Assessments
Designer's risk assessments for scaffold designs, recording the hazards we've designed out and the risks the site team need to manage.
Scaffold Inspection
Inspections that check a scaffold against its design and the regulations, with a clear written report and actions.