Crane Mats
Designs and calculations for crane mats and outrigger pads, matched to the crane, the lift and the ground conditions.
Temporary Works
Formwork designs that hold wet concrete safely and give you the finish and shape the permanent works need.

Our formwork design service gives contractors and temporary works coordinators safe, buildable designs for casting concrete. Formwork has to hold wet concrete in shape until it can support itself, and the pressure it carries depends on the height of the pour, the pour rate and how the concrete is placed.
We design each formwork scheme around the element being cast and the way you plan to pour it. That includes the concrete pressures, the panels and facing, the tie spacings, walings and soldiers, and the props or supports that hold everything in line. Where slab formwork needs support from below, we’ll confirm whether the props or falsework are included in the design.
You receive calculations and clear drawings that your site team can build from and your temporary works coordinator can review and approve.
We design formwork for sites across the UK and Ireland from our headquarters in Sheffield and our office in Cockermouth. See our temporary works services for other designed solutions.
Our process
Share the permanent works drawings, the pour heights and how you plan to place the concrete.
We confirm scope, price and delivery date.
We work out the concrete pressures and loads, then design the formwork and its support. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
You receive calculations and drawings ready for your temporary works coordinator and site team.
What we need from you
Send what you have. If anything's missing, we'll ask.
FAQs
Formwork is the temporary mould that holds wet concrete in shape until it has gained enough strength to support itself. It's used for walls, columns, slabs, beams and bases, and is struck once the concrete is strong enough.
Wet concrete pushes hard against the formwork, and the pressure rises with the height of the pour and how quickly it's placed. A design makes sure the panels, ties and supports can carry that pressure without bulging, moving or failing, and gives your temporary works coordinator calculations to check.
Yes. We can design around proprietary formwork systems or traditional timber formwork, depending on what you have available and what suits the job.
Tell us what you need. Slab formwork usually needs props or falsework below it, and we'll confirm in the quote what's included in the design.
Temporary Works
Designs and calculations for crane mats and outrigger pads, matched to the crane, the lift and the ground conditions.
Design of raking shores to support walls during demolition, alteration or repair, with calculations and site ready drawings.
Design of flying shores between parallel walls, for example after a mid terrace building is demolished.
Temporary support for retained facades during demolition and redevelopment, designed around the facade, the site and the programme.
Design of timber shoring, needling, propping and support structures, with calculations and clear details.
Design of bases, ties, landings and scaffold interfaces for construction hoists and mast climbing work platforms (MCWPs).
Design of temporary demountable structures for events, including stages and roofs, grandstands and seating, towers and platforms, and banner frames, entrance features and walkways.
Send us your drawings and details. We reply to every enquiry within 24 hours.