March, Cambridgeshire · Commercial
Temporary roof and access scaffold for Iceland, March
- Scaffold Design
- Surveying
Scaffold Design
Design of the external and internal scaffolds supporting asbestos removal at an industrial building on Carlisle Street, Sheffield, built by Trident Scaffolding.

Asbestos removal needed safe access to an industrial building on Carlisle Street, Sheffield, both outside over the full height of the gable and inside the building. The asbestos works also needed controlled working areas, so the scaffolding had to do more than provide access: it had to help contain the work.
Outside, the scaffold stands over the pavement, which needed to stay usable beneath it. Inside, the asbestos teams needed access along a long run of the building and a way to move through the bag lock and airlock zones.
We designed both the external and internal scaffolds, working with Trident Scaffolding, who erected them. The designs had to provide safe access, carry the shrink wrapped enclosure outside, and fit around the controlled zones inside.
The external scaffold has a pedestrian lift, keeping the pavement open underneath, with 2m lifts running to the top of the gable to give access over the full height of the structure. It was then shrink wrapped to create a controlled working environment for the asbestos works.
Inside, a 70m long scaffold gives access along the building, with a HAKI staircase and a birdcage scaffold providing access to the bag lock and airlock zones, so the asbestos teams could move safely through the controlled areas.
The scaffolding gave the asbestos teams safe access inside and out, with the shrink wrapped external scaffold and the internal access arranged around the controlled zones the work required.