Scaffold Design
As Built Designs
As built scaffold designs that record what's actually on site and confirm it's safe to use.

Overview
Our as built design service is for scaffolds that are already up. If a scaffold has been erected without a design, changed on site, or taken over from another contractor, an as built design records what’s actually there and confirms whether it’s safe for the loads it needs to carry.
We record the scaffold as built, produce as built drawings, and check it with calculations. If anything needs to change, such as extra ties, bracing or bases, we mark it up clearly so your scaffolders can put it right quickly.
Our team has worked in the scaffolding industry since 2012, so we know how scaffolds change on a live site, and how to bring them back in line without starting again.
We produce as built designs for sites across the UK and Ireland from our headquarters in Sheffield and our office in Cockermouth. If you’re starting from scratch, see our bespoke scaffold design service.
Our process
How it works
Step 1: Tell us about the scaffold
Share photos, any existing drawings and what has changed on site.
Step 2: Quote within 24 hours
We confirm scope, price and delivery date.
Step 3: Survey and design
We record the scaffold as built, then check it against its loads. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
Step 4: Issue
You receive as built drawings and calculations, with any changes needed clearly marked.
What we need from you
Information to send for a quote
Send what you have. If anything's missing, we'll ask.
- Site address or postcode
- Photos of the scaffold, ideally from every elevation
- Any existing design drawings, and what has changed since
- What the scaffold is being used for, and the loads it will carry
- Any sheeting, netting, loading bays or other special features
- Your programme dates
FAQs
Frequently asked questions
What is an as built scaffold design?
An as built design records a scaffold as it actually stands on site, then checks it against the loads it needs to carry. It's used when a scaffold has been put up without a design, or has been changed from its original design.
When would I need one?
Common reasons are a scaffold that was altered on site, an inherited scaffold on a project you've taken over, or a principal contractor or temporary works coordinator asking for a design that wasn't produced at the start.
What if the scaffold isn't adequate?
We'll set out exactly what needs to change, such as extra ties, bracing or base plates, so your scaffolders can bring it up to standard as quickly as possible.
Do you need to visit the site?
Not always. We visit site where it's needed, but we can often work from your photos and your scaffolder's measurements, which saves time and cost. We'll tell you which is best when we quote.
Scaffold Design
Other scaffold design services
Bespoke Scaffold Design
Bespoke scaffold designs with drawings and calculations, for access scaffolds, loading bays, temporary roofs, cantilevers, bridges and more.
Scaffolding Calculations
Scaffolding calculations for ties, loads, bases, beams, wind and more, on their own or to support a scaffold design.
3D Scaffold Modelling
3D models of scaffold designs, so contractors, clients and site teams can see how the scaffold fits the building and the site.
Designer's Risk Assessments
Designer's risk assessments for scaffold designs, recording the hazards we've designed out and the risks the site team need to manage.
Third Party Design Checks
Independent third party checks of scaffold and temporary works designs prepared by others, with check calculations and a design check report.
Scaffold Inspection
Inspections that check a scaffold against its design and the regulations, with a clear written report and actions.