Crane mat and outrigger pad designs that spread loads safely into the ground.

Our crane mat design service helps contractors, lifting teams and temporary works coordinators make sure the ground beneath a crane can safely carry the loads from its outriggers or tracks. A correctly designed crane mat spreads those loads so the ground isn’t overloaded and the crane stays stable throughout the lift.
Every design starts with the crane, the lift and the ground. We take the outrigger or track loads for your lift, look at the ground conditions and anything below the surface, and design mats or pads to suit. Where the ground information is limited, we’ll tell you what extra information would make the design more economical.
Crane mats are often needed on made ground, near excavations or retaining walls, over buried services, and on slabs or surfacing whose strength isn’t known. Getting the design right protects people, the crane and the programme.
You receive a design with calculations and a clear layout drawing to include in your lift plan and temporary works records.
We design crane mats for sites across the UK and Ireland from our headquarters in Sheffield and our office in Cockermouth. See our temporary works services for other designed solutions.
Our process
Share the crane, outrigger loads, lift plan and site information.
We confirm scope, price and delivery date.
We assess the loads and ground, then design the mats or pads. This typically takes 5 to 7 working days, depending on the size and type of project and your requirements.
You receive the design, calculations and layout drawing, ready for your lift plan.
What we need from you
Send what you have. If anything's missing, we'll ask.
FAQs
When the ground or surface under the crane can't be shown to safely carry the outrigger or track loads. This is common on made ground, near excavations, over buried services or on slabs and hardstandings of unknown strength. Industry guidance on crane stability recommends that the ground and any mats are properly assessed.
The maximum outrigger or track loads for the lift, along with the crane configuration. Your crane supplier or appointed person for lifting can usually provide these.
Not always. It depends on what's known about the site. Where there isn't enough information, we'll tell you what testing would help, such as plate bearing tests.
Get in touch with the details. We'll tell you whether a crane mat design suits your situation or whether a different temporary works solution is needed.
Temporary Works
Design of raking shores to support walls during demolition, alteration or repair, with calculations and site ready drawings.
Design of flying shores between parallel walls, for example after a mid terrace building is demolished.
Temporary support for retained facades during demolition and redevelopment, designed around the facade, the site and the programme.
Design of timber shoring, needling, propping and support structures, with calculations and clear details.
Design of formwork for concrete walls, columns, slabs and bases, with calculations and drawings your site team can build from.
Design of bases, ties, landings and scaffold interfaces for construction hoists and mast climbing work platforms (MCWPs).
Design of temporary demountable structures for events, including stages and roofs, grandstands and seating, towers and platforms, and banner frames, entrance features and walkways.
Send us your drawings and details. We reply to every enquiry within 24 hours.