Skip to content

Scaffold Design · Surveying

Temporary roof and access scaffold for Iceland, March

A drone survey and scaffold design for a temporary roof and access scaffold over an Iceland store in March, after part of its roof collapsed.

Temporary roof sheeting being fitted over the scaffold at the Iceland store in March, Cambridgeshire

The challenge

Part of the roof of an Iceland store in March, Cambridgeshire, had collapsed. Trident Scaffolding needed a temporary roof and access scaffold over the building, so that work on the damaged structure could carry on safely and under cover.

The damage made the scaffold design difficult. With the structure weakened, wall ties could only be fixed up to around 4 metres, well below the height the scaffold needed to reach. The site was also in the middle of a busy town centre, next to neighbouring shops and a pedestrian area.

Our solution

We started by surveying the building with a drone. This gave us a 3D model and a point cloud of the store and the damaged roof, so the scaffold could be designed around the building as it actually was after the collapse.

Working with Trident, we then designed the scaffold. Because ties were only possible up to around 4 metres, the scaffold relies on buttressing and other supports for its stability above that height, rather than ties into the damaged building. The temporary roof uses a DESSA rolling roof system, supported on the scaffold.

The outcome

The rolling roof could be rolled into place quickly once the scaffold was up, covering the building so other trades could get on with work inside.

Need a design, check or survey? Tell us about your project.

Send us your drawings and details. We reply to every enquiry within 24 hours.