Carlisle Street, Sheffield · Industrial
Asbestos removal scaffolding on Carlisle Street, Sheffield
- Scaffold Design
Scaffold Design · Structural Engineering
Design of a temporary roof and the steelwork supporting it over an existing structure at Leicester Royal Infirmary, so the building could be re roofed under cover.

An existing structure at Leicester Royal Infirmary needed re roofing. To let the work go ahead under cover, a temporary roof was needed over the top of it.
The scaffold couldn't touch the roof being replaced, so it had to be founded on the tops of the existing columns of the structure below. Those columns were at 3.3 metre centres, which didn't line up with where the scaffold needed support.
Our scope was to design both the steelwork and the temporary roof. We designed steel trimmer beams spanning between the tops of the existing columns, so the scaffold could be built up from the beams wherever it needed to be, rather than only where a column happened to be.
We designed the steelwork, its connections and the temporary roof together, so the loads from the roof could be followed all the way down into the existing columns.
The design allowed the temporary roof to go up over the existing structure without bearing on the roof being replaced, so the re roofing could be carried out under cover.