Scaffolding for asbestos removal: lessons from Carlisle Street, Sheffield
By Ben Wells · · 2 min read

Scaffolding for asbestos removal has to do more than give people somewhere safe to work. It often forms part of the controlled environment the asbestos work needs, and it has to fit around the way the asbestos teams move in and out of the work area.
Earlier this year we designed the scaffolding for a specialist asbestos project on Carlisle Street in Sheffield, both outside and inside an industrial building, working with Trident Scaffolding, who erected it.
What’s different about asbestos scaffolding
On most jobs, a scaffold’s main purpose is access. On asbestos removal it usually has to do a few more things:
- Support an enclosure. Shrink wrap or sheeting turns the scaffold into a covered structure that helps keep the work area controlled.
- Work with the controlled zones. Asbestos teams move through airlocks and bag locks, so access has to be arranged around those zones rather than cutting across them.
- Give access everywhere it’s needed. That can mean the full height of a gable outside and long runs inside a building.
Each of these changes the design. A fully wrapped scaffold attracts much higher wind loads than an open one, so the ties, bracing and foundations need to be designed for it. Internal scaffolds and birdcages need to suit the floor they stand on and the layout of the controlled areas.
Carlisle Street, Sheffield
Outside, the scaffold has a pedestrian lift to keep the pavement open, with 2m lifts running to the top of the gable to give access over the full height of the structure. It was then shrink wrapped to create a controlled working environment for the asbestos works.
Inside, a 70m long scaffold runs along the building. A HAKI staircase and a birdcage scaffold give access to the bag lock and airlock zones, so the asbestos teams could move safely through the controlled areas.
Planning asbestos removal?
Bring the scaffold designer in early. Where the enclosure goes, how people move through the controlled zones and how much of the scaffold will be wrapped all affect the design, so it’s best worked out alongside the asbestos contractor’s plans.
You can see more photos in our Carlisle Street case study, or find out more about our scaffold design services. We reply to every enquiry within 24 hours.